Construction & Building Materials
Heavy, bulky, and weight-sensitive
Construction materials push freight to its physical limits: marble slabs that crack if stowed wrong, cement that spoils if it takes on moisture, and steel and equipment that routinely exceed standard container weight limits.
We move tiles, marble, cement, steel and construction equipment for Pakistan's export and import trade, matching stowage, packaging and container choice to what each material actually needs to survive transit intact.
What construction freight demands
What we move
Tiles & Ceramics
Floor and wall tiles for export, requiring careful palletisation against chipping and breakage.
Marble & Natural Stone
Slabs and blocks requiring purpose-built crating and precise stowage planning.
Cement & Aggregates
Bulk or bagged cement exports requiring strict moisture protection throughout transit.
Steel & Structural Materials
Rebar, beams and structural steel, often oversized or overweight for standard containers.
Construction Equipment
Excavators, cranes and heavy machinery moved as project or breakbulk cargo.
Fixtures & Fittings
Sanitaryware, hardware and finishing materials for construction and renovation projects.
Construction freight problems — and how we handle them
| Problem | Why it happens | How we deal with it |
|---|---|---|
| Marble or stone cracking in transit | Slabs and blocks shift or take impact when stowage and crating are not built for the material. | Purpose-built crating and dunnage, with stowage plans that account for weight distribution specific to stone. |
| Cement spoiled by moisture | Cement is highly sensitive to humidity and can set or clump if exposed during transit. | Moisture-protective container liners and packaging specified as standard for cement shipments. |
| Overweight steel exceeding container limits | Structural steel and rebar frequently exceed standard container weight allowances. | Flat racks or appropriate equipment booked in advance based on actual cargo weight, not assumed volume. |
| Construction equipment needing project cargo handling | Excavators, cranes and heavy machinery routinely exceed standard container dimensions. | Route surveys and specialised equipment arranged before booking, as with other oversized cargo. |
| Site access issues on delivery | Construction sites often have limited access, unpaved roads or height restrictions. | Site conditions confirmed and permits for oversized road movement arranged ahead of delivery. |
Tools for construction shipments
CBM Calculator
Work out cargo volume for tiles, marble or building material shipments before booking.
Open calculatorContainer Size Guide
Compare standard, flat rack and open-top dimensions for heavy and oversized construction cargo.
Open guideFreight Cost Estimator
Get a ballpark landed-cost estimate for bulk construction material imports or exports.
Open estimator